Crossing By HDD

Horizontal Directional Drilling (HDD) emerges as a pivotal trenchless method for navigating challenging terrains and existing infrastructures like railway lines, bridges, and national highway roads. The process begins with meticulous planning and surveying to ascertain the optimal drilling trajectory that circumvents obstacles and adheres to geological considerations. A pilot hole is initially drilled along the designated path using specialized equipment. Subsequently, reaming tools enlarge the hole progressively to the desired diameter, creating an underground passage. The pipeline or conduit is then connected to a pullback mechanism and drawn through the tunnel, following the path established by the pilot hole. Grouting is often employed to reinforce stability by filling the voids between the infrastructure and the surrounding soil. Rigorous testing ensues to validate the integrity of the installed conduit or pipeline. Finally, the affected area is restored to its original state, ensuring minimal disruption to the environment and pre-existing infrastructure. HDD proves its mettle in preserving the integrity of railway lines, bridges, and national highway roads, enabling the expansion of essential utilities while minimizing surface disturbances and environmental impact.

Horizontal Directional Drilling is a versatile technique that has proven highly effective for creating passages beneath obstacles like railway lines, bridges, and national highway roads. Its ability to minimize disruptions and reduce the need for extensive excavation makes it a preferred choice for modern infrastructure development.

What We Do

  • A small-diameter pilot hole is drilled along the predetermined path using a drilling rig equipped with a specialized drill bit. This pilot hole serves as a guide for the subsequent steps.
  • The pipeline or conduit is attached to a pulling mechanism at one end, and the reaming tool is gradually pulled back along the drilled path. This action draws the pipeline or conduit through the underground tunnel created by the HDD process.
  • The affected area is restored to its original state, with landscaping and surface repairs completed as needed. This ensures that the surrounding environment and infrastructure are minimally impacted by the HDD process.